Settings
Theme

Description

In this hack you can play with all bosses like Richard Mayer, Duke King, Tung Fu Rue ,Michael Max, Raiden and Geese Howard in the single player story mode.

Geese Howard already unlocked In Vs Mode.

Hashes

Filename: Fatal Fury (USA).md
CRC32: 98d49170
SHA-1: 48b6277fc73368d8e96ba407a66f908c3bd87c39
Verified: Sega - Mega Drive - Genesis v.20260617-060303 (No-Intro)
Filename: Fatal Fury (Boss Hack).bin
CRC32: 51ab8c7
SHA-1: 3e98ab2b9b59cc7dd0b74716480030182130c2bb
Verified: No

Gallery

Reviews

Be the first to post a review See all 0 reviews

Last comments

Post a comment